ID Boletín | Fecha | Potencia | Tecnología | Tramitación | Tipo Resolución |
---|---|---|---|---|---|
BOE-A-2025-8095 | 4/21/2025 | 148.0 MW | Eólica | AAP AAC | Desfavorable |
BOE-B-2023-3917 | 2/7/2023 | 148.0 MW | Eólica | INF | |
BOE-A-2022-22665 | 12/27/2022 | 148.0 MW | Eólica | AAP | Favorable |
BOE-A-2022-16172 | 10/4/2022 | 148.0 MW | Eólica | DIA | Favorable |